Please enable JS

Works Continue at Eton College


29-May-2020

Our Soilmec SF120 is currently installing load bearing piles for the Eton Sports and Aquatics Centre at Eton College, Windsor for GRAHAM Building. Piles are 600mm diameter and up to 32.5m long and are installed from an intermediate piling platform level.

In the photographs you can also see our hard/hard secant wall being exposed and cropped down to level. We have installed over 200m of this secant wall, which will allow a retained height of around 4m acting in cantilever.

All piles are being installed through made ground, dense gravels and chalk with flints to depth.