Please enable JS

Piles Exposed in Central London


24-Aug-2020

A recent site visit to our Marble Arch project produced some great photographs showing the progress on this challenging build.

Our close proximity secant wall is being propped by CGL (Card Geotechnics Limited) designed buttress piles and RMD Kwikform props allowing the deepening of an existing basement.

Note the concrete lorry, seen on the first photo, shows the external road level, and gives an idea of overall depth.