Look back to the M25 Widening Project


16-Jun-2021

We continue our #WAMwednesday series with a look back to 2010/11 where we installed over 5.2km of sheet piling for a Skanska Balfour Beatty JV for the widening of the M25 J27-30.

Piles were up to 18m in length and installed into stiff clays, and we installed a variety of ancillary works which complimented our sheet piling offering.

This project seen the introduction of the first ever ABI TM22 piling rig with a new quick docking system allowing an automatic system for changing attachments in less than 2 minutes. The rig also runs an advanced energy efficiency system, which was ahead of its time. We now own and operate 4nr of these rigs.