This week we were busy on the M6 J13-15 Smart Motorway Project for Kier Group where we were installing sheet piles from the existing motorway during a planned closure as part of some embankment stabilisation works.

Due to the location of the works all plant had to be mobilised onto and off site on low loaders for each and every shift. Our team was given a 4 hour window (12 midnight to 4am) to unload the equipment, rig up, install the piles, derig and reload the equipment. On this particular night the team managed to install 10 pairs of AZ28-700 to 10.5m and even had time to pose for a photo! Piles were installed with one of our 80t ABI TM22s with powerful 30VV vibro hammer.